The Final AIP now submitted to Snapshot does not disclose the total value that will be transferred to ApeCo. This is the first AIP ever submitted to a vote without even a rough estimate of the total cost. This is a requirement included in AIP-1 before an AIP moves to a vote. AIP-1: Proposing the DAO - Process
We should therefore be provided a copy of the AIP Analysis Report and the DAR Package together with all Special Council comments to the same so that we can understand the reasoning behind changing the rules for this AIP.
We are, after all, still a DAO, until we are not.